Mounting the PDP / Strain Relief
....................................................................................................................................................................................................................................
Installation of the PDP /
Strain Relief
....................................................................................................................................................................................................................................
3 - 2 0
Important! The PDP is already mounted on the initial frames like
•
Rack NEBS-2000 (incl. doors) – 848727103
•
Rack NEBS-2000 (without doors) – 848775631
•
Rack ETSI-2 (incl. doors) – 848727095
•
Rack ETSI-2 (without doors) – 848775649.
............................................................................................................................................................
1
In case of ....
NEBS-2000 racks
ETSI-2 racks
E
S
N D
O F
T E P S
............................................................................................................................................................
Lucent Technologies
Then ....
Mount the Power Distribution Panel —
CC848727129 (item 2) and the Strain
Relief Plate — SC1006001 (item 1)
directly with Screw, Tapping
Thread-Forming, M6x16 —
CC901331421 (item 3) and Spacer —
CC848243325 (item 4) on the top of the
rack frame as shown in the figure
below. Lock then the power cables
properly on the strain relief.
Mount the Power Distribution Panel —
CC848727129 (item 2) directly with
Screw, Tapping Thread-Forming, M6x16
— CC901331421 (item 3) and Spacer
— CC848243325 (item 4) on the top of
the rack frame as shown in the figure
below.
Equipment Installation
365-374-059
Issue a, January 2002