Lucent Technologies LambdaUnite Installation Manual page 259

Multiservice
Hide thumbs Also See for LambdaUnite:
Table of Contents

Advertisement

NE Synchronisation Test
....................................................................................................................................................................................................................................
365-374-059
Issue a, January 2002
Select "External Timing Input Port 2" in the
field.
Set the
Timing Port Mode Monitoring
............................................................................................................................................................
Assign the system timing.
5
To do this, select
then the tab
System Timing Parameters
Timing
.
Select "QI Disable" in the
Messaging Mode
Set the
Wait To Restore
Set the
Clock Mode
............................................................................................................................................................
Verify that the NE is synchronising onto the first external clock source
6
for at least 3 minutes. To do this, select
the tab
External Timing Reference 1
............................................................................................................................................................
Disconnect the connection of the first clock source and click
7
Select
View
Timing/Sync...
.
Reference 2
Result:
The second clock source should become active.
............................................................................................................................................................
Reconnect the first clock source.
8
Result:
The first clock source should become active again after WTR
time has expired.
E
S
N D
O F
T E P S
............................................................................................................................................................
Lucent Technologies
Configuration
Timing/Sync
System Synchronisation Status
field.
time (WTR) to "1 Minute".
to "Locked".
.
, then the tab
Test Procedures
Assigned Port AID
field to "Monitored".
in the System view,
, then the tab
System
View
Timing/Sync
Close
External Timing
, then
.
6 - 1 1