Switching on and Testing the Voltage Supply Lines

....................................................................................................................................................................................................................................
Procedure
....................................................................................................................................................................................................................................
365-374-059
Issue a, January 2002
Proceed as follows to switch on and test the voltage supply lines:
............................................................................................................................................................
Insert a 68 A fuse for each supply line into the external Battery
1
Distribution and Fuse Bay (BDFB). If circuit breakers are being used
(in BDFB), put both of them in the ON position.
............................................................................................................................................................
Use the voltage meter to check the primary voltage at the Power
2
Distribution Panel (PDP) for both power supply feeders.
Result:
The voltage on the PDP must be in the range of -40.5 ... -72
DC.
NOTE: Do not power up the system if the voltage is outside the
range!