Mounting the Subrack

....................................................................................................................................................................................................................................
Procedure
....................................................................................................................................................................................................................................
3 - 5 0
............................................................................................................................................................
1
Unpack the subrack and check the installation materials.
Reference:
"Subrack Accessories" (3-46)
............................................................................................................................................................
Mount the subrack in its position in the rack frame.
2
Reference:
"Installation of Subrack" (3-52)
............................................................................................................................................................
Mount the grounding cable on the subrack.
3
Reference:
"ESD and Ground Connections" (4-28)
............................................................................................................................................................
Place "Circuit Packs" (3-55) according to the configuration.
4
............................................................................................................................................................
Route the fiber cables to the Optical Circuit Packs at the front of the
5
subrack and connect according to the configuration:
"Gigabit-Ethernet Interfaces" (4-68)
"Optical Interfaces" (4-64)
............................................................................................................................................................
Route the external cables to the rear of the subrack according to the
6
configuration:
"Station-Alarm Interface" (4-45)
"LAN 10/100 Base-T Interface" (4-49)
Timing Interfaces:
"TI-DS1 Station Clock Output/Input Interface 100/110 Ω"
-
(4-52)
"TI-E1 Station-Clock Output/Input Interface, 120 Ω" (4-56)
-
"TI-E1 Station-Clock Output/Input Interface, 75 Ω" (4-60)
-
"Rack-Top Alarm-Interface Cable, CI-CTL – PDP" (4-42)