Subrack-Alarm Wiring (Unite)
....................................................................................................................................................................................................................................
Routing of Subrack Cables
....................................................................................................................................................................................................................................
365-374-059
Issue a, January 2002
Important! These cables are mounted within the Unite rack-frames.
In case of ...
Upper Subrack
Lower Subrack
Result
Figure 4-5 Front/Top View of PDP
Lucent Technologies
Then ...
The Cable Assy, CI-CTL (Upper
subrack) - PDP — CC848811527/
DC1002828 (item 1) in the top of the
frame is routed at the rear-right side of
the center style of the frame.
The Cable Assy, CI-CTL (Lower
subrack) - PDP — CC848811535/
DC1001829 (item 2) of the lower DUR
subrack at the bottom of the frame is
routed through the right center-style of
the frame.
Cable Installation
4 - 9