Gestetner B147 Service Manual page 1036

Table of Contents

Advertisement

Rev. 10/2004
Installation Procedure
CAUTION
Remove the tape from the development units (see step 2) before you turn
the main switch on. The development units may be severely damaged if
they operate with the tape attached.
If you install an optional paper tray unit or the optional LCT at the same time, place
the copier on the paper tray unit or the LCT first, then install the copier and other
options.
NOTE: Keep the shipping retainers after installing the machine. You may need
them (in the future) to transport the machine to another location.
1. Remove the tape and padding on the copier. To remove the tapes from the
developer units follow the procedure below:
a) Turn the transfer belt release lever
counterclockwise.
b) Loosen two screws that fasten the drum plate.
Then lift the plate until you hear a click.
SM
[A]
B146I944.WMF
1-7
MACHINE INSTALLATION
B146I945.WMF
B147/B149/B190

Advertisement

Table of Contents
loading

This manual is also suitable for:

B149B190

Table of Contents