Planning And Preparing The Site; General Site Guidelines; Site Electrical Wiring Guidelines - Juniper SRX5400 Hardware Manual

Hide thumbs Also See for SRX5400:
Table of Contents

Advertisement

CHAPTER 7

Planning and Preparing the Site

General Site Guidelines

Related
Documentation

Site Electrical Wiring Guidelines

Copyright © 2017, Juniper Networks, Inc.
General Site Guidelines on page 89
Site Electrical Wiring Guidelines on page 89
SRX5400 Services Gateway Physical Specifications on page 90
SRX5400 Services Gateway Environmental Specifications on page 91
Site Preparation Checklist for the SRX5400 Services Gateway on page 92
Calculating Power Requirements for the SRX5400 Services Gateway on page 93
Efficient device operation requires proper site planning and maintenance and proper
layout of the equipment, rack or cabinet (if used), and wiring closet.
To plan and create an acceptable operating environment for your device and prevent
environmentally caused equipment failures:
Keep the area around the chassis free from dust and conductive material, such as
metal flakes.
Follow prescribed airflow guidelines to ensure that the cooling system functions properly
and that exhaust from other equipment does not blow into the intake vents of the
device.
Follow the prescribed electrostatic discharge (ESD) prevention procedures to prevent
damaging the equipment. Static discharge can cause components to fail completely
or intermittently over time.
Install the device in a secure area, so that only authorized personnel can access the
device.
Prevention of Electrostatic Discharge Damage on page 348
Table 23 on page 90
describes the factors you must consider while planning the electrical
wiring at your site.
89

Advertisement

Table of Contents
loading

Table of Contents