Clearance Requirements for SRX5400 Services Gateway Airflow and Hardware

Maintenance

Related
Documentation
Copyright © 2017, Juniper Networks, Inc.
When planning the installation site, you need to allow sufficient clearance around the
rack (see
Figure 55 on page
For the cooling system to function properly, the airflow around the chassis must be
unrestricted. Allow at least 8 in. (20.32 cm) of side clearance between side-cooled
devices. Allow 5.5 in. (13.97 cm) between the side of the chassis and any
non-heat-producing surface such as a wall.
A minimum of 3 inches clearance must be provided behind the power supplies for
airflow.
For service personnel to remove and install hardware components, there must be
adequate space at the front and back of the services gateway. At least 24 in. (61 cm)
is required both in front of and behind the device. NEBS GR-63 recommends that you
allow at least 30 in. (76.2 cm) in front of the services gateway.

Figure 55: Chassis Dimensions and Clearance Requirements

Overview of Installing the SRX5400 Services Gateway on page 131
SRX5400 Services Gateway Rack Size and Strength Requirements on page 99
101):
Chapter 8: Rack Requirements
101

Advertisement

Table of Contents
loading

Table of Contents