2JZ/2JX/2JV/2H7-1
3. Remove the connector.
4. While lifting the "A" sections, remove the
transfer belt unit from the machine.
Take care not to hit the transfer belt unit to
the sensor.
5. Replace the transfer belt unit and install it in
the machine in a horizontal manner.
6. Refit all the removed parts.
7. When the transfer belt unit is replaced with a
new one, carry out the following procedure.
8. Perform the following image adjustment.
1)Color Calibration
2)Color Registration
3)Maintenance mode U412 (adjusting the
uneven density) (see page 1-3-114).
4)Maintenance mode U410 (Adjusting the
halftone automatically) (see page 1-3-
110).
1-5-38
Connector
Transfer
belt unit
Sensor
Transfer
belt unit
A
Transfer
belt unit
Figure 1-5-64
A