Chassis Bolts And Nuts - Suzuki UY125 Service Manual

Table of Contents

Advertisement

2-18
PERIODIC MAINTENANCE

CHASSIS BOLTS AND NUTS

Tighten initially at 1 000 km (5 months) and every 4 000 km (20 months) thereafter.
Check that all chassis bolts and nuts are tightened to their specified torque. (Refer to page 2-19 for the loca-
tions of the following bolts and nuts on the motorcycle.)
1 Handlebar clamp bolt
2 Steering stem lock-nut
3 Front fork clamp bolt
4 Front fork cap bolt
5 Front axle nut
6 Engine mounting nut
7 Rear axle nut
8 Front brake caliper mounting bolt (UY125S)
9 Front brake hose union bolt (UY125S)
0 Front brake disc bolt (UY125S)
A Air breeder valve (UY125S)
B Front brake master cylinder bolt (UY125S)
C Rear shock absorber mounting nut (Upper & Lower)
D Front brake cam lever nut (UY125)
E Rear brake cam lever nut
F Spoke nipple
ITEM
http://mototh.com
N·m
kgf-m
60
90
28
33
42
85
120
12.0
25
23
23
7.5
0.75
10
29
8
11
4.5
0.45
6.0
9.0
2.8
3.3
4.2
8.5
2.5
2.3
2.3
1.0
2.9
0.8
1.1

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Uy125s

Table of Contents