Suzuki UY125 Service Manual page 82

Table of Contents

Advertisement

3-48
ENGINE
• Remove the kick starter driven gear 5, spring 6 and kick
starter shaft 7.
BEARING INSPECTION
Wash the bearing with a cleaning solvent and lubricate it with
motor oil before inspection. Rotate the inner race and check to
see that it turns smoothly. If it does not turn quietly and
smoothly, or if there are signs of any abnormalities, the bearing
is defective and must be replaced with a new one.
• Remove the kick starter shaft bearing with the special tool.
$ 09921-20240: Bearing remover set (10 mm)
REASSEMBLY
• Reassemble the kick starter in the reverse order of disassem-
bly. Pay attention to the following points:
• Apply SUZUKI SUPER GREASE "A" onto the inside of the
kick starter shaft spacer.
* 99000-25010: SUZUKI SUPER GREASE "A"
• Apply a light coat of SUZUKI SUPER GREASE "A" onto the
end of the kick starter shaft.
* 99000-25010: SUZUKI SUPER GREASE "A"
• Install the kick starter return spring 1, kick starter shaft 3,
and kick starter spring hook its end 1 onto the clutch cover
boss 2.
http://mototh.com
Play
Play

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Uy125s

Table of Contents