Cylinder Head Nuts And Exhaust Pipe Nut And Bolt; Chassis Nuts And Bolts - Suzuki UF50 Service Manual

Suzuki uf50 scooter
Table of Contents

Advertisement

CYLINDER HEAD NUTS AND EXHAUST
PIPE NUT AND BOLT
Tighten initially at 1 000 km (2 months) and every
3 000 km (6 months) thereafter.
Cylinder head nuts, when they are not tightened to the specified
torque, may result in leakage of the compressed mixture and
reduce output. Tighten the cylinder head nuts as follows.
Disconnect the spark plug cap and remove the spark plug.
(
2-5)
Remove the frame cover. (
Remove the cylinder/cylinder head cover 1.
Disconnect the spark plug cap.
Tighten the cylinder head nuts 2 and exhaust pipe nut 3
and bolt 4 to the specified torque.
Cylinder head nut: 10 N·m (1.0 kgf-m)
Exhaust pipe nut and bolt: 10 N·m (1.0 kgf-m)

CHASSIS NUTS AND BOLTS

Tighten initially 1 000 km (2 months) and every
3 000 km (6 months) thereafter.
Check that all chassis nuts and bolts are tightened to their specified torque.
1 Front axle nut
2 Steering stem locknut
3 Handlebar set bolt
4 Handlebar clamp nut
5 Front brake caliper mounting bolt
6 Front brake hose union bolt
7 Front brake caliper air bleeder valve
8 Front brake disc mounting bolt
9 Front brake master cylinder clamp bolt
0 Rear axle nut
A Rear shock absorber upper mounting bolt
B Rear shock absorber lower mounting nut
C Rear brake cam lever nut
5-4 and 5-5)
Item
PERIODIC MAINTENANCE
1
2
2
N·m
42
30
25
50
26
23
7.5
23
10
120
29
35
10
2-13
3
4
kgf-m
4.2
3.0
2.5
5.0
2.6
2.3
0.75
2.3
1.0
12.0
2.9
3.5
1.0

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents