Suzuki UY125 Service Manual page 105

Table of Contents

Advertisement

CYLINDER COWLING
• Install the cylinder cowling left cover 1.
INTAKE PIPE
• Install the intake pipe.
#
Use a new O-ring 1 to prevent sucking air from the
joint.
• Tighten the intake pipe mounting bolts to the specified torque.
" Intake pipe mounting bolt: 10 N·m (1.0 kgf-m)
FAN COWLING COVER
• Install the fan cylinder cowling right cover 1 and fan cowling
cover 2.
PAIR CONTROL VALVE
• Install the PAIR control valve 1. (!7-18)
STARTER MOTOR
• Fit the O-ring 1 to the starter motor.
• Apply a small amount of grease to the O-ring 1.
* 99000-25010: SUZUKI SUPER GREASE "A"
http://mototh.com
ENGINE
3-71

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Uy125s

Table of Contents