Cutting Reel Assembly Service - Toro Reelmaster 5010- H Service Manual

Hide thumbs Also See for Reelmaster 5010- H:
Table of Contents

Advertisement

Cutting Reel Assembly Service

4
2
3
Loctite #242
85 to 95 ft- lb
(115 to 128 N- m)
(Right Hand Threads)
RIGHT
FRONT
1. Cutting reel
2. Threaded insert (RH thread)
3. Bearing
Disassembly of Cutting Reel (Fig. 31)
1. Remove threaded inserts (items 2 and 8) from cut-
ting reel. The threaded insert with the groove on the face
has LH threads and is in end of reel shaft identified with
a groove that is just inside of reel spider (Fig. 32). Use
correct spline insert tool for insert removal (see Special
Tools in this chapter).
2. Slide bearings (item 3) from reel shaft.
3. Note orientation of flocked seals (item 4) for assem-
bly purposes (flocked (red) side orientated toward bear-
ing location). Remove flocked seals from reel shaft.
4. Note orientation of special washers (item 5) for as-
sembly purposes (flat side toward bearing location).
Carefully drive special washers from reel shaft.
5. If necessary, remove reel shaft plugs (item 7) from
reel shaft.
Cutting Units
5
6
7
Figure 31
4. Flocked seal
5. Special washer
6. Retaining ring
Page 7 - 26
1
Loctite #242
85 to 95 ft- lb
(115 to 128 N- m)
(Left Hand Threads)
7. Reel shaft plug
8. Threaded insert (LH thread)
6. Discard removed components and replace during
cutting reel assembly.
Inspection of Cutting Reel (Fig. 31)
1. Check the threaded inserts for excessive wear or
distortion. Replace inserts if damage is evident.
2. Inspect the reel shaft as follows. If reel damage is de-
tected, replace reel.
A. Check the reel shaft for bending and distortion by
placing the shaft ends in V- blocks.
B. Check the reel blades for bending or cracking.
C. Check the service limit of the reel diameter (see
Preparing a Reel for Grinding in this section).
7
6
5
4
3
8
Reelmaster 5010- H

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents