Piston (Traction) Pump Flow Test - Toro Reelmaster 5010- H Service Manual

Hide thumbs Also See for Reelmaster 5010- H:
Table of Contents

Advertisement

Piston (Traction) Pump Flow Test (Using Tester with Flow Meter and Pressure Gauge)
INTERNAL
CASE
DRAIN
P3
Procedure for Piston (Traction) Pump Flow Test
This test measures piston (traction) pump output (flow).
During this test, pump load is created at the flow meter
using the adjustable load valve on the tester.
IMPORTANT: Traction circuit flow for your Reel-
master is approximately 30 GPM (113.5 LPM). Use 40
GPM Hydraulic Tester #AT40002 (pressure and flow)
for this test (see Special Tools in this chapter).
1. Park machine on a level surface with the cutting units
lowered and disengaged. Make sure engine is off. Apply
the parking brake. Make sure mow speed limiter is in the
transport position to allow full movement of traction ped-
al.
2. Read Precautions For Hydraulic Testing in this sec-
tion.
Hydraulic System
TO STEERING CONTROL VALVE AND CHARGE CIRCUIT
P1
P2
100 MESH
SUCTION
STRAINER
R3
R4
R5
R9
FROM STEERING CONTROL VALVE
TO LIFT CONTROL MANIFOLD
A
B
Figure 37
Before opening hydraulic system, operate all hy-
draulic controls to relieve system pressure and
avoid injury from pressurized hydraulic oil. See
Relieving Hydraulic System Pressure in the Gen-
eral Information section of this chapter.
3. Make sure that traction pedal is adjusted to the neu-
tral position. Also, ensure that piston (traction) pump is
at full stroke when traction pedal is pushed into fully for-
ward position.
4. Raise and support machine so all wheels are off the
ground (see Jacking Instructions in Chapter 1 - Safety).
Page 4 - 40
TESTER
G5
FORWARD
TRACTION
WHEEL
MOTORS
G6
CAUTION
Reelmaster 5010- H
A
A
LH
RH
M7
M6
B
B