Installation - NEC Univerge SV8100 System Hardware Manual

Communications server
Hide thumbs Also See for Univerge SV8100:
Table of Contents

Advertisement

Issue 4.1
4 - 76
64 Kb/s Clear B-Channel and 16 Kb/s D-Channel
Two Status LEDs
Connector for PZ-2BRIA
These trunk circuits can be connected to either ISDN trunks or ISDN
telephones, depending on the switch setting within system
programming. All ISDN telephone circuits (#1-2 and #3-4 with the
BRI daughter board) are supplied DC power from the system.
The BRI Interface blade uses a single universal slot. Each blade
connects to the network via an NTI Network Termination.
In order to block new calls on the blade, system programming must
be used. This program will prevent new calls from being established
on the blade, but it will not terminate any existing calls.
With the maximum number of blades installed, the following can be
provided:
The 2BRI provides 30 BRI circuits and 60 BRI channels.
.
Table 4-38 CD-2BRIA Maximum Upgrade Capacities
maximum capacities for the CD-2BRIA blade when they are
upgraded.
Table 4-38 CD-2BRIA Maximum Upgrade Capacities
19" Chassis
with CPU
5
5.3.2

Installation

To install the CD-2BRIA
1.
Plug the CD-2BRIA blade into the system chassis.
2.
Before proceeding to Step 3, wait to verify that the STATUS
LED starts to flash. (Refer to
page 4-75
19" Chassis
without CPU
6
:
Figure 4-26 CD-2BRIA Blade on
for the location of the LEDs on the blade.)
UNIVERGE SV8100
provides the
19" Chassis
Networked
x4
Chassis
23
25
Installing the SV8100 Blades

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents