NEC Univerge SV8100 System Hardware Manual page 312

Communications server
Hide thumbs Also See for Univerge SV8100:
Table of Contents

Advertisement

Issue 4.1
5 - 54
Figure 5-58 Ribbon Cable Installed
9.
10.
Installing DT300/DT700 Series (DTL/ITL) Digital and IP Multiline Terminals
Guide
Align the projections on the bottom of the 8LKD
(LD)-L UNIT into the guide holes on top of the
multiline terminal.
Slide the 8LKD (LD)-L UNIT toward the keypad
buttons until snug (refer to
UNIT
Installed).
Figure 5-59 8LKD (LD)-L UNIT Installed
UNIVERGE SV8100
Projection
Guide
(One Each Side)
Figure 5-59 8LKD (LD)-L

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents