NEC Univerge SV8100 System Hardware Manual page 370

Communications server
Hide thumbs Also See for Univerge SV8100:
Table of Contents

Advertisement

Issue 4.1
6 - 16
4.
Terminate the extension leads to GRN/RED of the modular jack.
Terminate the unused leads to the jack.
5.
Install bridging clips as required.
6.
Plug a modular line cord from the mod jack to the CN1 connector on the
PGD(2)-U10 ADP.
7.
Connect the two-conductor station cable from the CN5 connectors within
the PGD(2)-U10 ADP to the external relay/external page.
Figure 6-13 PGD(2)-U10 ADP Cable Connection
UNIVERGE SV8100
Installing SV8100 Optional Equipment

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents