Issue 4.1
2.8
3 - 54
2.7.8
Install AC Power Cords on Multiple-Chassis (Optional)
1.
Locate the supplied AC power cords and attach to the AC Inlets
located on the back of the Controlling and Expansion Chassis.
Figure 3-66 Install 19" AC Power Cords (Multiple-Chassis)
2.7.9
Install Additional Blades
Refer to Chapter 5,
4-3.
2.7.10
Apply Power to the 19" Chassis
Refer to Chapter 5,
Installing the 9.5" Chassis
The 9.5" chassis provides 48 total ports (32 digital terminals) and can include
any combination of stations and trunks below this number.Install 9.5" Chassis
Grounding.
From the factory, the SG, ETH and PBXG grounds are located inside the
chassis and are connected to the FG (frame ground) on the back of the
chassis.
1.
Ensure the 9.5" chassis (CHS2U GW) is powered off and the AC power
cord is unplugged.
2.
Ground the chassis by connecting a 14 AWG wire from the FG lug on the
2.1 Installation and Safety Precautions on page
2.6 Powering Up the SV8100 on page
Installing the SV8100 Chassis
UNIVERGE SV8100
AC Power
Cords to
AC Inlets
4-9.