[Cruise Control] Removing/Installing Throttle Cables; Preparatory Work For All Bowden Cables; Removing/Installing Throttle-Opener And Throttle-Closer Cables - BMW k 1200 rs Repair Manual

Hide thumbs Also See for k 1200 rs:
Table of Contents

Advertisement

[Cruise control] Removing/
32 73
installing throttle cables
Preparatory work for all Bowden
cables
Remove left side panels (
d
Warning:
Comply with safety precautions when handling or
working with fuel.
Remove fuel tank (
16.5).
a
Remove left air outlet duct.
1
Disconnect plugs (1) of injection valves.
Remove fuel injection rail.
[Activated charcoal filter] Remove timing valve
from its holder.
Remove intake air silencer.
13.14
46.8).
a
KL130040
Removing/installing throttle-
32 72
opener and throttle-closer cables
2
3
8
7
Remove screw (5) and remove cover (4).
Disengage adjusting screw (7) for throttle-closer
cable (3).
Open adjusting screw (8) for throttle-opener
cable (2).
Remove throttle-cable relay (6).
Disengage throttle-opener cable (2) from its pull
and remove.
Disengage throttle-closer cable (3) from its pull.
Release cable ties at fairing bracket and pull
throttle cables down toward fuel injection rail to
remove.
2
Disengage throttle-opener cable (2) from its pull
at throttle-valve rail.
4
5
6
KL320042
KL130050

Advertisement

Table of Contents

Troubleshooting

loading

Table of Contents