INSTALLATION & SETUP
STEP 3 '
STEP 4 '
Stacking Procedure
2-6
Roadster/Mirage S+ User's Manual
Attach safety cables
Attach a safety cable to each of the (2) eyebolts
mounted on the bottom of the projector (Figure
2.8).
WARNING
Always use at least 2 safety cables for any
hoisting.
WARNING
Attach safety cables
to the 2 eyebolts.
NOTE: When hoisting a non-inverted projector
or stack, add 2 safety eyebolts in the front and
rear threaded holes provided on the top of the
projector. Make sure the eyebolts are rated
adequately for the load. Secure safety cabling
to both eyebolts.
Attach rigging hardware
Secure your rigging components to
the appropriate rigging points—8
sliding points are provided on the
bottom. Tighten the nut at each
required location (Figure 2.9) to
prevent sliding.
NOTES: 1) Use at least 4 rigging
points for all hoisting. 2) Use straps,
clamps or cabling with load capacity
adequate for the total projector
weight. See Section 6. 3) Do not join
the rigging straps or cables to a
common point—keep separated as
shown.
WARNINGS
• Maximum stack = 3 projectors.
• Stack first, then hoist.
'
NOTES: 1) Requires stacking hardware provided standard with Roadsters only.
Available separately for Mirage S
Roadster and Mirage S
position. Do not mix orientations—i.e., inverted with upright—in a stack. Secure a
maximum of 3 projectors with the stacking mounts as described below.
Figure 2.9. Using the Rigging Hardware
+
. 2) Installation requires at least 2 people.
+
projectors can be stacked in either the upright or inverted
Figure 2.8. Attach Safety Cables
NOTE: ADD EYEBOLTS (2)