Installation Outline - 2gig Technologies Go!Control Panel Installation & Programming Manual

Wireless security system
Hide thumbs Also See for Go!Control Panel:
Table of Contents

Advertisement

INSTALLATION OUTLINE
Use the following outline in conjunction with this Installation and Programming Guide to guide you through the installation 
steps.
Unpack the system and identify the system components.
1
2
Create an Installation Floor Plan to determine the best centralized location for the Control Panel. 
Decide where to best install the wired and/or wireless sensors. Guidelines are available in the Installation Instructions 
3
included with each sensor. 
4
Identify an unswitched wall outlet to use for the Control Panel's power supply. 
(Optional) Install the GSM (Cellular) Radio Module in the Control Panel. See "GSM (Cellular) Radio Module" on page 18.
5
NOTE: (Optional) If installing the 2GIG Go!Control POTS Module, identify or install a USOC. RJ31X telephone jack to connect 
the module to the phone line. See "Optional 2GIG Go!Control POTS Module" on page 16.
Use the Control Panel's backplate to mark the drywall cutouts for the Control Panel. Then make the cutouts and attach 
6
the backplate to the wall. See "Control Panel Mounting Plate" on page 14.
7
Install each of the system's wireless sensors. If either of the two hardwire loops are going to be used, install the contacts 
and route the loop wire to the Control Panel's wall cutout.
Install the optional hardwire sounder, and route the connection wire to the Control Panel's wall cutout.
8
If used, route the telephone line from the RJ31X jack to the Control Panel's wall cutout.
9
Use the third‐hand hanger strap to hang the Control Panel on the mounting plate. Then connect all wiring to the Control 
10
Panel's terminal block. See "Control Panel Wiring" on page 19 and "Terminal Block Wiring Diagram" on page 20. If you 
install the 2GIG Go!Control POTS Module, plug the telephone line into the POTS module. See "Optional 2GIG Go!Control 
POTS Module" on page 16.
Plug the backup battery connector into the connector on the circuit board.
11
Swing the Control Panel up, placing the bottom over the lip of the mounting bracket. Push the top of the Control Panel 
12
into the mounting bracket until it snaps into place, then secure it with the retaining screw.
Plug the power supply into the unswitched wall outlet.
13
Program the system as described in this manual and document any custom setup options for the end user in the space 
14
provided in the User Guide.
15
Test the system as described "Installer Testing" on page 68.
Educate the end user(s) about basic system operations and provide them with the Control Panel's User Guide.
16
Copyright © 2014 Linear LLC