Adding Expansion Modules - Avaya 4600 Series Installation Manual

Hide thumbs Also See for 4600 Series:
Table of Contents

Advertisement

IP Office Installation

1 1. Adding Expansion Modules

6 5 B
Each module is supplied with an expansion connect cable and a power supply unit. An appropriate
locale specific power cord for the power supply unit, and cables for the ports on the front of the module
must be ordered separately.
Warnings
No cable other than an Expansion Interconnect cable should be used. Use of any alternate cable
will lead to system failure.
Installation Requirements
1.
Installation space either on or under the existing IP Office control unit.
2.
Switched power outlet socket.
3.
Free EXPANSION port on the rear of the control unit.
4.
Grounding Requirements
1.
Functional Grounding
Connection of a functional ground is:
2.
Protective Grounding
Connections of a protective ground via surge protection equipment is:
Tools Required
1.
Manager PC.
2.
Tools for rack mounting (optional).
Installation Manual
IP Office 3.2
External expansion modules, except the WAN3, connect to the IP Office
control unit using a blue 1 meter (3'3'') expansion interconnect cable.
Note
Expansion modules are only detected by the IP Office control unit,
if the Expansion modules are powered up and running before the
control unit is started. The control unit power on process includes
a delay to ensure that if all modules in a system are started at the
same time, the expansion modules should complete their power
up before the control unit.
Recommend for all modules.
Connection of a functional ground is mandatory for Analog Trunk module.
Mandatory for Analog trunk modules in the Republic of South Africa.
Mandatory for Digital Station and Phone modules connected to out of building
extensions.
Mandatory for Digital Station V2 and Phone V2 modules.
15-601042 Issue 14b (13th November 2007)
Page 98