A . Basic Installation
4 B

0 1. Unpacking Equipment

5 5 B
Use the following procedure when unpacking any equipment supplied by Avaya or an Avaya distributor.
Objective
To check that the correct equipment has been supplied and that no damage has occurred during transit.
Information Required
1.
Equipment Checklist.
Draw up an installation checklist of the parts and equipment expected.
Procedure
1.
Check for Package Damage.
Before unpacking any equipment, check for any signs of damage that may have occurred during
transit. If any damage exists bring it to the attention of the carrier.
2.
Check the Correct Parts Have Been Delivered.
Check all cartons against the packing slip and ensure that you have the correct items. Report any
errors or omissions to the equipment supplier.
3.
Retain All Packaging and Documentation.
While unpacking the equipment, retain all the packaging material. Fault returns are accepted only
if repackaged in the original packaging. If performing a staged installation, the original packaging
will also assist when repacking equipment to be moved to the final install site.
4.
Check All Parts.
Visually inspect each item and check that all the necessary documentation and accessory items
have been included. Report any errors or omissions to the dealer who supplied the equipment.
5.
Check All Documentation.
Ensure that you read and retain any documentation included with any items.
6. Proceed to 02. Installing the Admin Applications.
Installation Manual
IP Office 3.2
15-601042 Issue 14b (13th November 2007)
Page 77

Advertisement

Table of Contents
loading

This manual is also suitable for:

5600 seriesIp office 3.2

Table of Contents