6.11 Adding Expansion Modules

Each module is supplied with an expansion connect cable and a
cord
for the power supply unit, and
Warnings
• No cable other than an Expansion Interconnect cable should be used. Use of any alternate cable will lead to
system failure.
Installation Requirements
Installation space either on or under the existing IP Office control unit.
Switched power outlet socket.
Free EXPANSION port on the rear of the control unit.
Grounding Requirements
Functional Grounding
Connection of a
Recommend for all modules.
Connection of a functional ground is mandatory for Analog Trunk module.
Protective Grounding
Connections of a protective ground via
Mandatory for Analog trunk modules in the Republic of South Africa.
Mandatory for Digital Station and Phone modules connected to out of building extensions.
Mandatory for Digital Station V2 and Phone V2 modules.
Tools Required
Manager PC.
Tools for rack mounting
IP Office Installation
IP Office
External expansion modules, except the WAN3, connect to the IP Office control unit
using a blue 1 meter (3'3'') expansion interconnect cable.
• Note
Expansion modules are only detected by the IP Office control unit, if the
Expansion modules are powered up and running before the control unit is
started. The control unit power on process includes a delay to ensure that if
all modules in a system are started at the same time, the expansion modules
should complete their power up before the control unit.
cables
for the ports on the front of the module must be ordered separately.
functional ground
is:
surge protection equipment
(optional).
IP400 Basic Installation: Rack Mounting
power supply
unit. An appropriate
is:
15-601042 Issue 20b (16 July 2009)
locale specific power
Page 127

Advertisement

Table of Contents
loading

Table of Contents