To Test Timer Contact Points - ALLIANCE AE9133 Service Manual

Ae/ag/ne/ng series home laundry dryers
Table of Contents

Advertisement

Section 5 Service Procedures
To reduce the risk of electric shock, fire, explosion, serious injury or death:
• Disconnect electric power to the dryer(s) before servicing.
• Close gas shut-off valve to gas dryer(s) before servicing.
• Never start the dryer(s) with any guards/panels removed.
• Whenever ground wires are removed during servicing, these ground wires must be
reconnected to ensure that the dryer is properly grounded.

To Test Timer Contact Points

1. Remove six screws (three on top and three at
lower front) holding the hood assembly to the
control hood rear panel and cabinet top. Refer to
Figure 8 or 9.
2. Disconnect wires from timer.
NOTE: Refer to appropriate wiring diagram when
rewiring timer.
Circuit to be Tested
Timer Motor
Signal Control
Motor
Heat
High Temperature Heat
Low Temperature Heat
(Delicate)
Push-to-Start
24
Timer No.
Timer No.
59418
59420
L1 and M
L1 and M
P and B
L1 and M
L1 and M
L1 and H
L2 and H
M and S
© Copyright, Alliance Laundry Systems LLC – DO NOT COPY or TRANSMIT
WARNING
3. Set test meter to read OHMS and put meter
probes to terminals indicated in table below.
4. Starting with timer knob indicator in OFF
position at top of timer, slowly turn timer knob
clockwise until indicator is again pointing toward
OFF position at top of timer. Meter should
register "zero" reading when circuit being tested
is completed by timer. Refer to appropriate
wiring diagram for Timer Cycle Chart showing
when circuit is made.
Timer No.
Timer No.
59421
L2 and T
L2 and T
B and P
L1 and M
L1 and M
L2 and H
L2 and H2
L2 and H1
M and S
Timer No.
59422
59497
L2 and T
P and B
B and B
L1 and M
L2 and H
W001R1
Timer No.
61402
L2 and T
P and B
L1 and M
L2 and H2
L2 and H1
and H2
60549

Advertisement

Table of Contents
loading

Table of Contents