ALLIANCE AE9133 Service Manual page 75

Ae/ag/ne/ng series home laundry dryers
Table of Contents

Advertisement

Section 8 Service Procedures Unique to Electronic Control Model Dryers
To reduce the risk of electric shock, fire, explosion, serious injury or death:
• Disconnect electric power to the dryer(s) before servicing.
• Close gas shut-off valve to gas dryer(s) before servicing.
• Never start the dryer(s) with any guards/panels removed.
• Whenever ground wires are removed during servicing, these ground wires must be
reconnected to ensure that the dryer is properly grounded.
Through Serial No. S6271975XG–
Reinstall the three cupped washers and nuts
if removed in Step 3 and tighten securely,
or use cupped washers and nuts from the
accessories pack if the cord is being
installed for the first time.
Starting Serial No. S6271976XG–Using
the three wire-binding (10-32x3/8") screws
from the accessories envelope (located
inside the cylinder, unless the screws were
previously removed in Step 2), attach the
power cord wires to the terminal block
terminals as follows:
(a) Red to Red
(b) Black to Black
(c) White to White (see NOTE below)
NOTE: When installing the white wire, loop the free
eyelet end of the green ground wire (from Step 4)
and place it together with the white wire. Attach
both wires to the neutral (center) terminal on the
terminal block. Refer to Figure 56.
IMPORTANT: Failure to tighten the screws firmly
on the terminal block may result in terminal block
failure.
(9) Tighten the two strain relief screws to
secure the power cord.
(10) Recheck all nuts or screws to be sure they
are tight.
(11) Reinstall the access plate and screw to the
rear of the dryer cabinet.
74
© Copyright, Alliance Laundry Systems LLC – DO NOT COPY or TRANSMIT
WARNING
W001R1
60549

Advertisement

Table of Contents
loading

Table of Contents