Iec-60870-5-104 Protocol Implementation - ProSoft Technology ProTalk PTQ-104C User Manual

Table of Contents

Advertisement

49TPTQ-104C ♦ 48TQuantum Platform
47TIEC 60870-5-104 Client
9.2

IEC-60870-5-104 Protocol Implementation

The intent of this section is to provide a quick understanding of how the PTQ-
104C module implements the IEC-60870-5-104 protocol, without going into
complex details of the specification.
The IEC-60870-5-104 protocol applies to Telecontrol equipment and systems
with data transmission for monitoring and controlling geographically widespread
processes. This protocol consists of the IEC-60870-5-101 protocol, with the
addition of TCP/IP as the transport mechanism.
Any application with the IEC-60870-5-104 protocol consists of a client
(Controlling Station) and one or more servers (Controlled Stations). The client
constantly monitors and controls the data from each server in the TCP/IP
network.
The PTQ-104C operates as an IEC-60870-5-104 client; sending read or write
commands to remote server(s).
ProSoft Technology, Inc.
March 4, 2013
Reference
12TUser Manual
Page 109 of 136

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the ProTalk PTQ-104C and is the answer not in the manual?

Subscribe to Our Youtube Channel

Table of Contents