Complete Power Redundancy Setup
For proper redundant operations, both power supplies must be powered at all times. To take full advantage of the dual
power feeds and redundant power supplies on the Enova DGX Switcher, we recommend cabling the primary Enova
DGX Switcher power feed, via a power strip to an outlet connected to one circuit breaker and the redundant power feed
via a power strip to an outlet connected to a second circuit breaker.
FIG. 20
Power setup for complete redundancy on Enova DGX 32
Caution: We recommend attaching all power cords to a surge protector and/or an AC line conditioner.
Power-Up Sequence
The following instructions start with attaching only two source and destination devices for the purpose of executing a
test switch (after the factory default switch is disconnected).
To apply power:
1.
Attach the first two source and destination devices.
Do not apply power to the source and destination devices until Step 8.


2.
Optional – Attach an external control device/system (see page 54).
Instruction Manual – Enova DGX 8/16/32 Digital Media Switchers
If connecting devices to DXLink Boards, the boards require DXLink HDMI Transmitters and Receivers.
Install the Transmitters and Receivers between the first two source and/or destination devices and the
DXLink Boards (see "System Setup with DXLink™ Transmitters and Receivers" on page 83 and the
product's documentation).
If connecting devices to SC Optical Boards, the boards require DGX Fiber Modules. Install the modules
for the first two source and/or destination devices and then connect the modules to the SC Optical Boards
(see "System Setup with DGX Fiber Modules" on page 97 and the module's documentation).
Installation and Setup