Integrated Lights Out Manager 2.0 User's Guide - Fujitsu SPARC Enterprise T5140 Product Notes

Sparc enterprise
Hide thumbs Also See for SPARC Enterprise T5140:
Table of Contents

Advertisement

Notes on the "SPARC Enterprise T5x40 Device Tree"
The device tree of the DVD drive indicated on page 39 is not supported for the servers
shipped after September 2009. The correct tree is as follows:
For the servers shipped after September 2009
/pci@400/pci@0/pci@1/pci@0/usb@0,2/hub@4/device@4/storage@0/disk
Incorrect Description in "Managing Disks - Creating
Hardware RAID Volumes ▼ Create a Hardware
Mirrored Volume"
The description on page 18 should be modified as the following underlined part.
If you create a second IM volume before the first IM volume completes its synchronization,
the first volume's RAID status will indicate SYNC, and the second volume's RAID status
will indicate DEGRADED.
Integrated Lights Out Manager 2.0 User's
Guide
Incorrect ILOM Command Related to IP Address
Assignment
The ILOM commands indicated on page 23 and page 28 include erroneous information.
setpendingipdiscovery= should be set pendingipdiscovery=.
Incorrect Command in the Section "Edit an SNMP
User Account Using the CLI"
The following command described on page 195 is incorrect.
56
SPARC Enterprise T5140 and T5240 Servers Product Notes • November 2012

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sparc enterprise t5240

Table of Contents