Fujitsu SPARC Enterprise T5140 Product Notes page 130

Sparc enterprise
Hide thumbs Also See for SPARC Enterprise T5140:
Table of Contents

Advertisement

Firmware and General Software Events (Continued)
TABLE B-1
CR ID
Description
6835854
In case that the NET-MGT port of ILOM has not been
connected with the LAN cable and the network
6779753
gateway is not set, the ILOM network configuration
cannot be set.
For the output example, see
Configuration Cannot Be Set (CR 6835854,
6779753)" on page
6830397
In ILOM3.0, you cannot set "service" to the
/HOST/diag mode property or the diag_mode
property of the ALOM CMT compatible shell. If you
set, it is displayed as "unknown."
6815369
For DC input power models, /PS0/AC_POK and
/PS0/DC_POK identify sensors in the power supply
units. /PS0/AC_POK does not represent an AC power
supply unit. For examples, see
Models, /PS0/AC_POK Is Displayed (CR 6815369)"
on page
124.
6752910
After a host power-on instruction is executed from
ILOM, the POST may not start, and processing may
not go to Solaris OS boot processing or the ok
prompt for OpenBoot PROM.
For details, see
Executed from ILOM, the POST May Not Start, and
Processing May Not Go to OS Boot Processing or the
ok Prompt (CR 6752910)" on page
6739633
When the host is off, any prepare_to_remove
operation for the component selected in the ILOM
Web interface (System Information tab ->
Components tab) may cause the radio button of the
component to disappear.
In the "Ready to Remove Status" column,
"NotReady" changes to "Ready (No Power)" for the
component, but "Return to Service" cannot be
performed for the component because the radio
button is no longer displayed.
120
SPARC Enterprise T5140 and T5240 Servers Product Notes • November 2012
"The ILOM Network
123.
"For DC Input Power
"After a Host Power-On Instruction Is
125.
Workaround
None.
Connect the LAN cable to the NET-MGT port of
ILOM and then set the network configuration.
None.
The following settings offer the POST diagnosis in a
mode equivalent to the "service."
/HOST/diag mode = normal
/HOST diag level = max
/HOST verbosity = max
None.
After turning off the power to the host, wait at least
three minutes before turning it on again.
Make the following setting from the CLI:
• set /SYS/(selected-component)
return_to_service_action=true

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sparc enterprise t5240

Table of Contents