In the Calendar, the items display with a check box to the left of them. When you complete an item
in the Tasklist, you can mark it complete by selecting the check box.
5.4.2 Assigning a Due Date to a Tasklist Item
1 Open an item in the Tasklist folder.
2 Click
.
3 Select Activate Tasklist due date, then select a date.
5.4.3 Reordering the Tasklist Folder
There are multiple ways to reorder the Tasklist folder:
"Moving Items Up or Down in the Tasklist" on page 69
"Moving an Item to the Top or Bottom of the Tasklist" on page 69
Moving Items Up or Down in the Tasklist
1 Open the Tasklist folder.
2 Select the item you want to move.
3 (Conditional) To move the item up in the list, click the up-arrow located above the Folder List
until the item is in the desired position.
4 (Conditional) To move the item down in the list, click the down-arrow located above the Folder
List until the item is in the desired position.
Moving an Item to the Top or Bottom of the Tasklist
1 Open the Tasklist folder.
2 Select the item you want to move.
3 (Conditional) To move the item to the top of the list, click the Move to top arrow located above
the Folder List.
4 (Conditional) To move the item to the bottom of the list, click the Move to bottom arrow located
above the Folder List.
Tasks and the Tasklist
69
Need help?
Do you have a question about the GROUPWISE 8 - WEBACCESS CLIENT and is the answer not in the manual?