Site Selection - NEC PowerMate Professional 9000E Series User Manual

Hide thumbs Also See for PowerMate Professional 9000E Series:
Table of Contents

Advertisement

This chapter provides the information you need to set up and
use the PowerMate Professional 9000E Series workstation.
Some of the information provided includes site selection,
system preparation, cable connections, system startup and
shutdown procedures, and system care. It also provides a
matrix showing where to find additional information about
the workstation.

Site Selection

The system operates reliably in a typical office environment.
Choose a site that is:
T
Near grounded, three-pronged power outlets.
Note: For the U.S. and Canada, use a
NEMA 5-15R outlets for 100-120 VAC or
NEMA 6-15R outlets for 200-240 VAC. For
other international sites, use a three-pronged
power outlet applicable for the electrical
code of the region.
Be sure the power service connection is through
a properly grounded outlet.
T
Clean, dust-free, and well ventilated. Front and rear
ventilating openings kept free of obstructions. Away from
sources of heat, vibration or physical shock.
2-2 Setting Up the System
!
WARNING

Advertisement

Table of Contents
loading

Table of Contents