Using the Simple Program Function
Operating Procedure
Operation Level
PV/SP
C
25.0
100.0
Initial Setting Level
Input Type
in-t
5
• SP Mode
STRT and RSET can be executed for the simple program without re-
gard to the SP mode. SP mode changes are enabled while the simple
program is being executed. Timing will continue in the SP mode after
the change.
SP mode
LSP
Timing is performed according to the SP of the bank being
executed.
RSP
Timing is performed according to the remote SP.
• RSP Input Errors
Timing will be continued even if an RSP input error occurs while the
simple program is being executed.
Note Timing will be performed according to the PV and remote SP at the
time of the RSP error.
• Switching RUN and STOP
Timing will continue if RUN and STOP are switched while the simple
program is being executed.
• Changing Banks
If the bank is changed while the simple program is being executed, the
time up to that point will be cleared and timing will start for the new
bank's set value.
Perform the following procedure to use the simple program function.
Program pattern: STOP
Valid program bank: 1
Bank 0 set point: 150°C, Soak time: 5 min, Wait band: 3°C
Bank 0 set point: 200°C, Soak time: 10 min, Wait band: 5°C
Wait band = 3
SP0=150.0
PV
Bank 0
RSET → STRT
Soak time = 5 min
1. Press the O Key for at least three seconds to move from the operation
level to the initial setting level.
2. Select the Program Pattern parameter by pressing the M Key.
Description
Wait band = 5
SP0=200.0
Bank 1
Soak time = 10 min
Section 4-16
End display
End output
STOP