Power-Up Self-Test - Paradyne 3150 Operator's Manual

Acculink 315x channel service unit
Hide thumbs Also See for 3150:
Table of Contents

Advertisement

ACCULINK 315x CSU

Power-Up Self-Test

After you connect the CSU to a power source, the unit
performs the power-up self-test to ensure that it is in good
working order. The CSU performs this test on itself upon
power-up or after a device reset, unless it has been
disabled by the Self-Test configuration option (see
Appendix C,
Configuration
The self-test includes a basic processor test, a limited
memory test, a code checksum test, and basic verification
tests of the internal components. The front panel LCD
displays the progress and pass/fail status of these
power-up tests.
The power-up self-test consists of the following steps:
1. Once the CSU is plugged in, the In Progress
screen appears and the Fail LED blinks ON and
Off continuously.
Self-Test:
In Progress
F1
2. All the LEDs then start to flash simultaneously in
the pattern twice ON, then Off. Then, the LCD
begins to flash characters and numbers in the same
pattern, alternating with the flashing LEDs.
3. If the self-test is successful, the Passed screen
appears for one second, the Fail LED turns Off
and the OK LED lights.
Self-Test:
Passed
F1
2-8
Options).
F3
F2
F2
F3
If the self-test fails, the Failed screen appears for
five seconds. The Fail LED lights, and an
eight-digit failure code (xxxxxxxx) is displayed for
use by service personnel to determine the cause of
the self-test failure. The CSU continues to try to
operate. If you are in doubt about the results of the
self-test, use the Self-Test Health command to
display the status of this test (see the
Health
section in Chapter 4, Maintenance).
4. The top-level menu screen appears.
February 1998
Self-Test
Self-Test:
Failed xxxxxxxx
F1
F2
F3
CSU ESF
Stat
Test
Cnfig
F3
F1
F2
3150-A2-GB21-80

Advertisement

Table of Contents
loading

This manual is also suitable for:

3151

Table of Contents