Paradyne 3150 Operator's Manual page 80

Acculink 315x channel service unit
Hide thumbs Also See for 3150:
Table of Contents

Advertisement

ACCULINK 315x CSU
General Configuration Options
Tst Timeout: Enab
Next
Enab
Disab
Prev
Test Timeout. Specifies whether user-initiated loopback and pattern tests have durations that are specified by the
Tst Duration configuration option.
Enab – Loopback and pattern tests initiated on the CSU have specified durations.
Disab – Disables test timeout. The tests are terminated manually.
NOTE: For CSUs that are remotely managed through an inband data stream such as EDL or FDL, the recommended
setting is Enab. If tests are inadvertently left in the active state, the Enab setting will allow the test to timeout
(terminate) after a specified time.
Tst Duration: 10
Next
Up
Down
Save
Test Duration. Specifies the duration (1 to 120 minutes) of user-initiated loopback and pattern tests. (The Tst Timeout
configuration option must be set to Enab.) Use the left or right arrow key to position the cursor on the digit you want to
change. Use the Function keys (Up or Down) to increment or decrement the digit.
Up – Increments the test duration.
Down – Decrements the test duration.
Save – Stores the test duration.
C-6
Table C-3
General Configuration Options
Prev
February 1998
3150-A2-GB21-80

Advertisement

Table of Contents
loading

This manual is also suitable for:

3151

Table of Contents