Boom Assembly - Skyjack SJ82 T Operation Manual

Telescopic booms
Hide thumbs Also See for SJ82 T:
Table of Contents

Advertisement

Section 4 – Inspections Before Operation
1
2
3

4.2-9 Boom assembly

Do the inspection that follows, and make sure:
Load cell
1
There are no loose or missing parts, and there
is no visible damage.
All fasteners are correctly tightened.
All cables are in good condition and not loose.
There is no debris between the platform and
the boom adaptor.
Rotary actuator
2
There are no loose or missing parts, and there
is no visible damage.
All fasteners are correctly tightened.
All hoses are correctly tightened and there is
no sign of hydraulic leakage.
Jib (optional equipment)
3
There are no loose or missing parts, and there
is no visible damage.
All fasteners are correctly tightened.
All hoses are correctly tightened and there is
no sign of hydraulic leakage.
Cable Track
4
There are no loose or missing parts, and there
is no visible damage.
213205AAA
46
6
8
4
Visual and daily maintenance inspections
7
5
Cylinders
5
Make sure the cylinders are correctly installed.
Make sure there is no indication of leaks or
damage.
Wear pads
6
All fasteners are correctly tightened.
There are no loose or missing parts, and there
is no visible damage to the wear pads.
Boom
7
There are no loose or missing parts, and there
is no visible damage.
All fasteners are correctly tightened.
All hoses are correctly tightened and there is
no sign of hydraulic leakage.
Hoses
All hoses are correctly tightened and there is
no sign of hydraulic leakage.
6
8
SJ82 T, SJ86 T

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sj86 t

Table of Contents