Section 4 – Inspections Before Operation
1
2
3
4.2-9 Boom assembly
Do the inspection that follows, and make sure:
Load cell
1
There are no loose or missing parts, and there
▪
is no visible damage.
All fasteners are correctly tightened.
▪
All cables are in good condition and not loose.
▪
There is no debris between the platform and
▪
the boom adaptor.
Rotary actuator
2
There are no loose or missing parts, and there
▪
is no visible damage.
All fasteners are correctly tightened.
▪
All hoses are correctly tightened and there is
▪
no sign of hydraulic leakage.
Jib (optional equipment)
3
There are no loose or missing parts, and there
▪
is no visible damage.
All fasteners are correctly tightened.
▪
All hoses are correctly tightened and there is
▪
no sign of hydraulic leakage.
Cable Track
4
There are no loose or missing parts, and there
▪
is no visible damage.
213205AAA
46
6
8
4
Visual and daily maintenance inspections
7
5
Cylinders
5
Make sure the cylinders are correctly installed.
▪
Make sure there is no indication of leaks or
▪
damage.
Wear pads
6
All fasteners are correctly tightened.
▪
There are no loose or missing parts, and there
▪
is no visible damage to the wear pads.
Boom
7
There are no loose or missing parts, and there
▪
is no visible damage.
All fasteners are correctly tightened.
▪
All hoses are correctly tightened and there is
▪
no sign of hydraulic leakage.
Hoses
All hoses are correctly tightened and there is
▪
no sign of hydraulic leakage.
6
8
SJ82 T, SJ86 T