Boom Assembly - Skyjack SJ82 T Service Manual

Telescopic booms
Hide thumbs Also See for SJ82 T:
Table of Contents

Advertisement

Scheduled Maintenance Inspections
2
1

1.6-9 Boom Assembly

Rotary actuator
1
There are no loose or missing parts, and there
is no visible damage.
All fasteners are correctly tightened.
All hoses are correctly tightened and there is
no sign of hydraulic leakage.
Jib (if equipped)
(B)
2
There are no loose or missing parts, and there
is no visible damage.
All fasteners are correctly tightened.
All hoses are correctly tightened and there is
no sign of hydraulic leakage.
Boom
(B)
3
There are no loose or missing parts, and there is
no visible damage.
All fasteners are correctly tightened.
All hoses are correctly tightened and there is no
sign of hydraulic leakage.
Make sure there are no visible cracks in welds or
structure and there are no signs of deformation.
SJ82 T, SJ86 T
5
4
Section 1 – Scheduled Maintenance
3
6
Cable Track
(B)
4
There are no loose or missing parts, and there
is no visible damage.
Wear Pads
(B)
5
All fasteners are correctly tightened.
There are no loose or missing parts, and there
is no visible damage to the wear pads.
Cylinders
(B)
6
Make sure the cylinders are correctly installed.
Make sure there is no indication of leaks or
damage.
Make sure all pins and bushings are secure
and properly tightened.
Control Cables and Hoses
7
There are no loose or missing parts, and there
is no visible damage.
All hoses are correctly tightened and there is
no sign of hydraulic leakage.
7
5
(B)
229040ABA
27

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sj86 t

Table of Contents