7.2.4 To install the outdoor unit

7.2.5 To provide drainage

EBLA09~16D + EDLA09~16D
Daikin Altherma 3 M
4P620241-1B – 2022.05
1 Put the slings (delivered as accessories) through the unit's feet (left and right).
2 Carry the unit by the slings, and put it onto the installation structure.
±150
kg
3 Remove the slings, and dispose of them.
4 Fix the unit to the installation structure.
Make sure that condensation water can be evacuated properly.
Install the unit on a base to make sure that there is proper drainage in order to
avoid ice accumulation.
Prepare a water drainage channel around the foundation to drain waste water
away from the unit.
Avoid drain water flowing over the footpath, so that it does NOT become slippery
in case of ambient freezing temperatures.
6× M12
7
Unit installation
|
Installer reference guide
69