7.2.4 To install the outdoor unit
7.2.5 To provide drainage
EBLA09~16D + EDLA09~16D
Daikin Altherma 3 M
4P620241-1B – 2022.05
1 Put the slings (delivered as accessories) through the unit's feet (left and right).
2 Carry the unit by the slings, and put it onto the installation structure.
±150
kg
3 Remove the slings, and dispose of them.
4 Fix the unit to the installation structure.
▪
Make sure that condensation water can be evacuated properly.
▪
Install the unit on a base to make sure that there is proper drainage in order to
avoid ice accumulation.
▪
Prepare a water drainage channel around the foundation to drain waste water
away from the unit.
▪
Avoid drain water flowing over the footpath, so that it does NOT become slippery
in case of ambient freezing temperatures.
6× M12
7
Unit installation
|
Installer reference guide
69