Information - Daikin EBLA09D V3 Series Installer's Reference Manual

Hide thumbs Also See for EBLA09D V3 Series:
Table of Contents

Advertisement

11
|
Configuration

11.6.8 Information

Installer reference guide
190
Calculation of the gas price
Gas price=Actual gas price+(Incentive/kWh×0.9)
Gas price=4.08+(5×0.9)
Gas price=8.58
Calculation of the electricity price
Electricity price=Actual electricity price+Incentive/kWh
Electricity price=12.49+5
Electricity price=17.49
Price
Gas: 4.08 /kWh
Electricity: 12.49 /kWh
Overview
The following items are listed in the submenu:
8
Tank
User settings

Information

Installer settings
Commissioning
Dealer information
The installer can fill in his contact number here.
#
Code
[8.3]
N/A
Reset
Reset the configuration settings stored in the MMI (user interface delivered as
accessory).
Example: Energy meterings, holiday settings.
INFORMATION
This does not reset the configuration settings and field settings of the hydro module
of the outdoor unit.
Value in breadcrumb
[7.6]=8.6
[7.5.1]=17
[8] Information
[8.1] Energy data
[8.2] Malfunction history
[8.3] Dealer information
[8.4] Sensors
[8.5] Actuators
[8.6] Operation modes
[8.7] About
[8.8] Connection status
[8.9] Running hours
[8.A] Reset
Description
Number that users can call in case of problems.
EBLA09~16D + EDLA09~16D
Daikin Altherma 3 M
4P620241-1B – 2022.05

Advertisement

Table of Contents
loading

Table of Contents