Daikin EBLA09D V3 Series Installer's Reference Manual page 56

Hide thumbs Also See for EBLA09D V3 Series:
Table of Contents

Advertisement

6
|
Application guidelines
Installer reference guide
56
Examples in case of normal kWh rate power supply
1 power meter is sufficient.
Outdoor unit (1N~) with integrated
backup heater (1N~)
=> b: Single-phase power meter
0
0
58 0
1 5 0
a
b
X5M/5+6
c
c
d
e
f
A
Outdoor unit (1N~) + external backup
heater kit (1N~ or 3N~)
=> b/b*: Single- or three-phase power
meter (depending on external backup
heater kit)
0
0
58 0
1 5 0
45 08 96
.0 05
c
c
d
e
A
* 3N~
A Outdoor unit
B DHW tank
C External backup heater kit
a Electrical cabinet: Normal kWh rate power supply
b Power meter
c Overcurrent fuse
d Compressor module
e Hydro module
f Backup heater
g Booster heater
Outdoor unit (3N~) with integrated
backup heater (1N~)
=> b*: Three-phase power meter
c
g
B
Outdoor unit (3N~) + external backup
heater kit (1N~ or 3N~)
=> b*: Three-phase power meter
a/a*
b/b*
X5M/5+6
c/c*
g
f/f*
B
C/C*
0
0
58 0
1 5 0
a*
b*
45 08 96
.0 05
X5M/5+6
c*
c
c
d*
e
f
A*
0
0
58 0
1 5 0
a*
b*
45 08 96
.0 05
X5M/5+6
c*
c
d*
e
g
A*
B
C/C*
EBLA09~16D + EDLA09~16D
Daikin Altherma 3 M
4P620241-1B – 2022.05
g
B
c/c*
f/f*

Advertisement

Table of Contents
loading

Table of Contents