Allied Telesis SwitchBladex8112 Installation Manual page 92

Table of Contents

Advertisement

Chapter 4: Safety Precautions and Site Requirements
Warning
Mounting of the equipment in the rack should be such that a
hazardous condition is not created due to uneven mechanical
loading.  E25
Warning
Remove all metal jewelry, such as rings and watches, before
installing or removing a line card from a powered-on chassis. 
E26
Warning
The chassis may be heavy and awkward to lift. Allied Telesis
recommends that you get assistance when mounting the chassis in
an equipment rack.  E28
Warning
This unit might have more than one power cord. To reduce the risk
of electric shock, disconnect all power cords before servicing the
unit.  E30
Note
If installed in a closed or multi-unit rack assembly, the operating
ambient temperature of the rack environment may be greater than
the room ambient temperature. Therefore, consideration should be
given to installing the equipment in an environment compatible with
the manufacturer's maximum rated ambient temperature (Tmra). 
E35
Caution
Installation of the equipment in a rack should be such that the
amount of air flow required for safe operation of the equipment is not
compromised.  E36
Warning
Reliable earthing of rack-mounted equipment should be maintained.
Particular attention should be given to supply connections other than
direct connections to the branch circuits (e.g., use of power strips).
 E37
92
Section II: Installing the Chassis

Advertisement

Table of Contents
loading

Table of Contents