Figure 63: Locking The Handle On The At-Sbxpwrsys1 Dc System Power Supply - Allied Telesis SwitchBladex8112 Installation Manual

Table of Contents

Advertisement

Section II: Installing the Chassis
SwitchBlade x8112 Chassis Switch and AT-SBx81CFC960 Card Installation Guide
8. Lower the locking handle of the power supply module to secure the
module in the slot, as shown in Figure 63.
Figure 63. Locking the Handle on the AT-SBxPWRSYS1 DC System
Note
Do not tighten the handle locking screw yet. You may need to
slightly lift the handle to move the plastic guard panel when you
connect the positive and negative wires in "Powering On the AT-
SBxPWRSYS1 DC System Power Supply" on page 192.
9. To install a second AT-SBxPWRSYS1 DC System Power Supply,
repeat this procedure.
10. After installing the power supplies, go to Chapter 7, "Installing the AT-
SBx81CFC960 Control Card and Ethernet Line Cards" on page 133.
Note
Retain the five wire ring lugs that come with the power supply. You
use them to wire the power supply in "Powering On the AT-
SBxPWRSYS1 DC System Power Supply" on page 192.
Power Supply
131

Advertisement

Table of Contents
loading

Table of Contents