ECD 100-194 EN81 Manual page 61

Table of Contents

Advertisement

SDX
ST2
time
time
Note:
1. On inspection, SP3 turns on for inspection speed.
2. PRV input must be ON, prior to a run.
3. The end of the run is initiated by loss of leveling.
4. On inspection SP1 turns off.
ABB VF
DS/US UF/DF SP1
SPEED
N/A
1
0
0
N/A 0 rpm
INSP SLOW
0
1
0
RPM / Contract fpm x 10 = set for 10fpm
INSP FAST
1
1
0
RPM / Contract fpm x 50 = set for 50fpm
LEV
0
0
1
RPM / Contract fpm x 10 = set for 10fpm
SLOW
1
0
1
RPM / Contract fpm x 25 = set for 25fpm
INTER
0
1
1
RPM / 0.75 = set for 75% Cont Spd
FAST
1
1
1
Set as per motor rpm sync spd (RPM)
VF Drive Type 3
Setting "07" ABB-VF, PDL VF
BRK then holds up for SDX time and then UD,U/D is
held up for ST2 time in 10ms increments.
SDX time must be less than ST2 time
FUNCTION
59
PDL VF. MULTI REF. 3 WIRE CONTROL
MF14
MF15
MF16
DS/US UF/DF SP1
SPEED
MULTI REF. FUNCTIONS
N/A
1
0
0
N/A 0 rpm
INSP SLOW -M2
0
1
0
Set for 10fpm
INSP FAST -M6
1
0
Set for 50fpm
1
LEV -M1
0
0
1
Set for 10fpm
SLOW -M5
1
0
1
Set for 25fpm
INTER -M3
0
1
1
Set for 75% Cont Spd
FAST -M7
1
1
1
Contract Speed (as a %)
ST2
SDX
time
time

Advertisement

Table of Contents
loading

Related Products for ECD 100-194 EN81

Table of Contents