E E P R O M S E T T I N G S
of the control system.
MSU MSD DZ
UIM Zone
DOOR LOCK VALVE TEST:
Before testing of the UIM function is commenced, the door lock valve must be tested using the Lock Valve Switch
on the 100-194 control board. With the lift travelling down, switch the Lock Valve Switch from the down position
(on) to the up position (off). Confirm visually that the lift stops moving down.
UIM TEST:
To commence the UIM test, place lift at floor level. Do not test at bottom floor due to extended MSU/DZ
magnets.
Place the lift on On-Board Inspection with the doors closed, by switching "INSP controller" to ON.
Nb: The UIM Test procedure simulates the lift with the doors not in the closed position.
Proceed to Eeprom setting UIM on the LCD
Using ENT and ^ button, set to UIM to 01
Press ENT to confirm the change
UIM Test shall be displayed
Press and hold the BOT CALL button.
The lift shall now move down at leveling speed.
UIM Testing shall be displayed
Once the lift moves beyond the UIM zone (MSU and MSD OFF, DZ ON), BRK relay shall de-energise, dropping
the door lock valve and stopping lift movement. Confirm lift has stopped visually.
Keep BOT CALL pressed until UIM Test: Pass shows on screen.
This confirms the lift has stopped moving down by checking DZ input has stayed on.
Nb: If BOT CALL is released before UIM Test is completed, UIM Test: Incomplete shall be displayed.
Upon successful completion of the UIM test, press the UIM button to return the lift to UIM Test.
To re test, move the lift back to floor level using the On-Board Inspection buttons and press BOT CALL.
Floor Level
??-
INS IDL
UIM ff
On-Board Insp
??-
INS IDL
UIM 01
UIM Test
On-Board Insp
??d INS RDN
UIM 01
UIM Testing...
On-Board Insp
25
--
: 11111111
--
: 00000001
--
: 00000001
??- INS IDL
UIM 01
UIM Test:
On-Board Insp
--
: 00000001
Pass