Reinstall the front panel assembly.
5.

ASSY Receptacle LigaSure Replacement

Remove the front panel assembly.
1.
Remove the three screws that secure the RFID/Barcode module to the front panel
2.
assembly.
Lift the RFID/Barcode module and LigaSure Receptacle away from the front panel
3.
assembly.
Locate the replacement LigaSure receptacle in place of the removed one.
4.
Locate the RFID/Barcode module on top of the LigaSure Receptacle aligning the three
5.
screw holes.
Secure the RFID/Barcode module and LigaSure receptacle to the front panel assembly
6.
using the 3 previously removed screws and the Phillips screwdriver set to 0.7Nm+/-
10%.
Reinstall the front panel assembly.
7.

ASSY Cable to Power Supply to Main PCBA Replacement

Remove the front panel assembly.
1.
Using the screwdriver, loosen the two screws securing the power supply cable to the
2.
power supply and disconnect the cable from the power supply.
Remove the other end of the cable from P30 on the main PCBA.
3.
Insert the replacement power supply cable to the 2 screws on the power supply,
4.
making sure that the red wire is seated behind the top screw. Secure using the Phillips
screwdriver set to 1.0Nm+/-10%.
Secure the other end of the cable to P30 on the main PCBA.
5.
Reinstall the front panel assembly.
6.

Control Cable Main PCBA to Power Supply Replacement

Turn the system off. Disconnect the power cord from the wall receptacle.
1.
Remove the 4 screws that secure the top cover to the chassis. Lift the cover off the
2.
chassis. Set the cover and screws aside for reinstallation.
Disconnect the power supply control cable from the power supply at J3.
3.
Disconnect the power supply control cable from the main PCBA at P31.
4.
Connect the replacement power supply control cable to the locations listed in the
5.
above 3 steps.