3. CARRIER ROLLER
1)
REMOVAL
(1)
Loosen tension of the track link.
Jack up the track link height enough to
(2)
permit carrier roller removal.
Loosen the bolt and nut(1)
(3)
Open bracket(2) with a screwdriver, push
(4)
out from inside, and remove carrier roller
assembly.
Weight : 5kg(11Ib)
2)
INSTALL
(1)
Carry out installation in the reverse order
to removal.
Grease valve
Jack
1
7-130
Frame
Carrier roller
1
2
R35Z77TR04
R35Z77TR05
R35Z77TR06