3. CHARGING CIRCUIT
When the starter is activated and the engine is started, the operator releases the key switch to the ON
position.
Charging current generated by operating alternator flows into the battery through the battery
relay(CR-1).
The current also flows from alternator to each electrical component and controller through the fuse
box.
1 1 )
OPERATING FLOW
(1)
Warning flow
Alternator "L" terminal
(2)
Charging flow
+"
Alternator "B
terminal
2)
CHECK POINT
Engine
Start switch
ON
ON
GND : Ground
I/conn [CN-2(13)]
Battery(+) terminal
Check point
- GND (Battery voltage)
- GND (Alternator B
+
terminal)
- GND (Cluster)
4-15
Cluster [CN-56(3)]
Cluster warning lamp
Voltage
10~12.5V