Hyundai r35z-7 Workshop Manual page 274

Hide thumbs Also See for r35z-7:
Table of Contents

Advertisement

3
3
)
DISASSEMBLING THE MAIN PUMP
(1)
Remove the port plate since the force of
the control spring is strong, remove the
hexagon socket head cap screws holding
the port plate by means of the jigs.
(M12
40, 3 pieces), (M12 55, 1 piece)
Hexagon socket screw key (10 mm)
(2)
Remove the cover.
Use the jig to hold the port in a horizontal
condition, and unloosen the hexagon
socket set screw of the jig slowly, to
remove the port plate.
Be careful because the control plate is
provided to the backside.
(3)
This photo shows the state with the port
plate removed.
Hexagon socket
set screw
Hexagon socket
set screw
7-14
R35Z77MP10
R35Z77MP11
R35Z77MP12

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents