Hyundai r35z-7 Workshop Manual page 305

Hide thumbs Also See for r35z-7:
Table of Contents

Advertisement

(
(
3)
M
M
ain relief, port relief valves
Install the main relief valve(14).
Spanner : 30mm
Tightening torque : 6kgf m(43.4lbf ft)
Install the over load relief valve(15).
Spanner : 22mm
Tightening torque : 4kgf m(28.9lbf ft)
(4)
Main spools
Carefully insert the previously assembled
spool assemblies into their respective
bores within of body.
Fit spool assemblies into body
carefully and slowly. Do not under any
circumstances push them forcibly in.
(
(
5)
Covers of pilot type
Fit spool covers(8) tighten the hexagonal
socket head bolts(10) with washer to the
specified torque.
Hexagon wrench : 5mm
Tightening torque : 1~1.1kgf m
Confirm that O-rings(7) have been fitted.
(7.2~7.9lbf ft)
7-45
14
R35Z77MCV09
15
R35Z77MCV10
2
R35Z77MCV05
8
7
10
R35Z77MCV04